Introduction to Lean Construction - Module II: Advanced Concepts and Tools

Prof. Koshy Varghese,, Prof. N. Raghavan,, Prof. Ganesh Devkar · 2022 · 85 free video lectures

This course covers advanced concepts in Lean Construction. Building on the introductory module that covered basic concepts, this module covers concepts such as flow and variability as well as tools such as location-based methods. In addition, the relevance of lean concepts in Contracts and in the…

▶ Play on Open Lecture HallCourse page ↗

Lectures

  1. Flow in Production Systems - Part 1
  2. Flow in Production Systems - Part 2
  3. Process Performance Parameters - Part 1
  4. Process Performance Parameters - Part 2 - Discrete Event Simulation (DES) - ExtendSim
  5. Process Performance Parameters - Part 3: Throughput & Capacity
  6. Process Performance Parameters - Part 4: Cycle Time
  7. Process Performance Parameters - Part 5: Work In Progress (WIP)
  8. Process Performance Parameters - Part 6: Utilization
  9. Process Performance Parameters - Part 7: Bottleneck, Raw Process Time, Critical WIP, Takt Time
  10. Process Performance Parameters - Problem 1 & Problem 2
  11. Push Production System
  12. Pull Production System
  13. Process Analysis for Waste Minimization
  14. Engineering Procurement Construction Process
  15. Pull Planning Case Studies in EPC
  16. Introduction to Variability
  17. Impact of Variability on Process Parameters
  18. Impact of Variability - Balanced Process
  19. Impact of Variability - Unbalanced Process
  20. Upstream - Downstream Variability
  21. Variability Management - Approaches
  22. Introduction to Location Based Management System (LBMS)
  23. Introduction - Scheduling Methods
  24. Application of Location Based Planning
  25. Location Breakdown Structure (LBS)
  26. Flow lines and Identification of Wastes
  27. Case Studies
  28. LBMS Tutorial - Exercise 1 - Part1 - Finishing Works - Process
  29. LBMS Tutorial - Exercise 1 - Part2
  30. LBMS Tutorial - Exercise 1 - Part3
  31. LBMS Tutorial - Exercise 1 - Part4
  32. LBMS Tutorial - Exercise 1 - Analysis from Flow Perspective
  33. LBMS Tutorial - Exercise 2.A
  34. LBMS Tutorial - Exercise 2.B & C
  35. LBMS Tutorial - Exercise 2.C
  36. LBMS Tutorial - Exercise 2 - Analysis from Flow Perspective
  37. Construction Contracts and Lean Construction Versions
  38. Typical Problems in Construction Contracts
  39. Contracts with Lean Concepts: "Relational" Contracts
  40. Integrated Project Delivery/ Development (IPD) - Part 1
  41. Integrated Project Delivery/ Development (IPD) - Part 2
  42. Integrated Project Delivery/ Development (IPD) - Part 3
  43. Integrated Project Delivery/ Development (IPD) - Part 4
  44. Project Alliance Contracting Model (PACM) - Part 1
  45. Project Alliance Contracting Model (PACM) - Part 2
  46. Project Alliance Contracting Model (PACM) - Part 3
  47. Lean Project Delivery System (LPDS) - Part 1
  48. Lean Project Delivery System (LPDS) - Part 2
  49. Lean Project Delivery System (LPDS) - Part 3
  50. Lean Project Delivery System (LPDS) - Part 4
  51. Target Value Delivery (TVD) - Part 1
  52. Target Value Delivery (TVD) - Part 2
  53. Target Value Delivery (TVD) - Part 3
  54. Target Value Delivery (TVD) - Part 4
  55. Summary
  56. Lean in Design
  57. Design Process & Importance of Design Process
  58. Design & Value
  59. Conventional Project Delivery & Design
  60. Target Value Delivery
  61. Lean Tools for Design
  62. Choosing by Advantages (CBA) - Decision Making
  63. Choosing by Advantages (CBA) - Principles, Definitions & Steps
  64. Choosing by Advantages (CBA) - Alternatives in the Design Process
  65. Choosing by Advantages (CBA) - Exercise - Part 1
  66. Choosing by Advantages (CBA) - Exercise - Part 2
  67. Choosing by Advantages (CBA) - Case Study - Part 1
  68. Choosing by Advantages (CBA) - Case Study - Part 2
  69. Process Mappping & Waste Identification through VSM - Complexity of Design Process
  70. Process Mappping & Waste Identification through VSM in Construction
  71. Process Mappping & Waste Identification (DO) through VSM in Design Process
  72. Process Mappping & Waste Identification (WN) through VSM in Design Process
  73. Process Mappping & Waste Identification (TIME) through VSM in Design Process
  74. Applying Value Stream Mapping in Architectural Design Process
  75. Process Mappping and Waste Identification through VSM - Swimlane Diagram
  76. Applying VSM in Design Process - Case Study - Current State VSM
  77. Applying VSM in Design Process - Case Study - Lean Tools for Improvement
  78. Applying VSM in Design Process - Case Study - Future State VSM
  79. Information Management Tools - Design Documentation & Information Flow
  80. Information Management Tools - Design Structure Matrix - Part 1
  81. Information Management Tools - Design Structure Matrix - Part 2
  82. Information Management Tools - Design Interface Management/ Dependency Structure Matrix (DSM)
  83. Information Management Tools - Design Construction Interface - Pull Planning - Case Study
  84. Information Management Tools - Generative Design
  85. Acknowledgement